was successfully added to your cart.

Cart

DAIRY FARM LANEWAYS – Murwillumbah, NSW

By March 13, 2015Uncategorised

Problem
John Loebsteins paddock laneways were a muddy quagmire from the rainfall and the cattle traffic running up and down the laneways along with tractors and other vehicles ripping up the surface. When this mud dries it also creates a very rough and bumpy surface with large potholes.

Solution
Diamond Grid was installed throughout the laneways, creating a solid, draining surface that would not turn to mud and cause the cattle and vehicles to sink 6 inches in mud. When the surface dries it goes back to a level, smooth surface.