The Problem
BHP required the pathways around their Mine Plants to have a firm, level, well-draining surface to keep the workers out of the mud in periods of wet weather.
The Solution
- The area was levelled
- Diamond Grids were laid
- Diamond Grids were filled with 12mm gravel.