The Problem
Energex required a solid surface for a temporary truck depot on McLeay Island off the Queensland coast. During the wet season the trucks would get bogged and create an uneven surface in the yard.
The Solution
- The area was levelled
- Diamond Grid was laid through the entire Depot
- The grids were then filled with a 10mm Gravel.